|
Post by yarpen on Oct 29, 2017 3:40:59 GMT
Approximately 336 tiles East-West, 3 tiles Wide. Planned with permission of Nachtmahr to mine under his deed (Skadis Rest). Western end of the tunnel is at Zarpen's Grotto (misspelled when created). General image of the tunnel is here, but actual tunnel will be straight: drive.google.com/file/d/0B5YXBHPYIQPAUWR2RUxmLWl5eHc/view?usp=sharing****** With the exception of about a dozen ore/stone veins in the tunnel & more on the walls, every tile has been reinforced***** Still working on adding planks to the walls, but that's just cosmetics
|
|
|
Post by Nachtmahr on Oct 29, 2017 4:58:48 GMT
Nachtmahr approves
|
|
|
Post by maertuerer on Oct 31, 2017 17:41:23 GMT
Can we join your project? We are planning a Highway to your Deed in cooperation with Beanz and Jaegar. Here is our Thread.
|
|
|
Post by yarpen on Oct 31, 2017 23:14:59 GMT
Can we join your project? We are planning a Highway to your Deed in cooperation with Beanz and Jaegar. Here is our Thread.Maertuerer, I would never turn down assistance. I'm currently 1640E on the single tile through the center. I'm going with a 'high tunnel then mine down the floor to slope' once everything is widened and the ceiling is leveled.
|
|
|
Post by yarpen on Mar 12, 2018 16:39:48 GMT
Final Bump
|
|
|
Post by Engineer on Mar 23, 2018 15:53:56 GMT
paid
|
|