Post by yarpen on Jan 14, 2018 10:47:53 GMT
Approximately 70 tile long canal, 3 tiles wide to take the shortest route from these landlocked lakes to the open sea. Bridges will be about 20 tiles from the ends, 2 total. NE end at 1316, 1515 & SW end around 1246, 1585. I have already gotten permission from Gustl to dig through his deed (Pirate Bay). This link will show the planned Canal. drive.google.com/open?id=1HOGOFnsPsYx-jZ49bDUNp4WOErEjOXQuI will be working on it, and may get assistance from Vash since he was a big help for the last canal we made.
|
|
|
Post by Engineer on Jan 15, 2018 12:50:14 GMT
I would recommend to build a water tunnel instead of a canal on the surface since the elevation should allow it. This would preserve this small hunting ground.
The outcome is the same but the area would stay pretty much untouched.
|
|
|
Post by yarpen on Jan 16, 2018 12:55:58 GMT
Engineer,
The only issue that I may see with that is that I dont know how high the rock level is underneath the desert.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Jan 16, 2018 13:27:20 GMT
Try to dig a single hole and see when you hit rock. If corner has water in it, you can't build a tunnel.
If the hole does not have water, try to see how far you are from the waterbed. Lots of methods to do so from simply counting the tile elevation (the hard way) to using mods that will automatically count it for you (the easy way).
Once you have the idea how deep water goes you can subtract, say 20 dirts from your current point since the rock floor is never perfectly flat and there will be variation in elevation.
If you are high enough a boat tunnel is preferred.
Come back with the results and the GMs can approve the project.
Peace o7
|
|
|
Post by yarpen on Jan 18, 2018 21:06:10 GMT
When digging for dirt along the proposed route, I hit rock level at the following points: 1269, 1562 21 1285, 1546 38 1293, 1538 40
Each one was well over 50 sand dug before hitting rock. There are minor dips between each of these points in height as well, so do you still recommend/require that I do a tunnel? Or should I proceed as originally proposed?
|
|
|
Post by Engineer on Jan 20, 2018 15:32:03 GMT
i see, i checked as well, you would have to go pretty far inside the desert before you would be able to properly create a tunnel.
yes you can continue as original planned
|
|
|
Post by yarpen on Sept 8, 2018 22:22:20 GMT
This canal has been finished, thanks for the permissions to complete it.
Gustl if you want, I can build a bridge for you across the canal.
|
|