Post by vitez on Mar 4, 2018 19:50:02 GMT
Continuation of the Hansa-Taco Manor tunnel (for start: sklotopolis.freeforums.net/thread/2932/ ) It appears JonHalo has gone into hibernation. Tunnel-project continues by other members of the alliance Remaining rock to be dug out (estimated 200 tiles long stretch) will be mined away to make tunnel 2 wide along the entire distance Remaining deposits and veins will be mined away to remove narrows Reinforcements will be put in place for a stretch of estimated 480 tiles length of tunnel to prevent cave-ins Catseyes will be placed to complete the tunnel for the highway network
|
|
|
Post by vitez on Mar 7, 2018 6:32:12 GMT
update: 7th of march 2018 Remaining rock has been mined out
What remains: 24 veins remaining to be removed 322 tiles length remaining to be reinforced catseyes needing to be placed for the entire length of tunnel
update: 9th of march 2018 What remains: 23 veins remaining to be removed 267 tiles length remaining to be reinforced catseyes needing to be placed for the entire length of tunnel
update: 19 of march 2018 All tiles are now reinforced
What remains: 22 veins remaining to be removed catseyes needing to be placed for the entire length of the tunnel
|
|
|
Post by vitez on Mar 22, 2018 13:45:26 GMT
update: 22th of march 2018 What remains: 19 veins remaining to be removed catseyes need to be placed for the entire length of the tunnel
update: 24th of march 2018 What remains: 17 veins remaining to be removed catseyes need to be placed for the entire length of the tunnel
update: 31th of march 2018 What remains: 14 veins remaining to be removed around 450 catseyes still need placing
update: 4th of april 2018 What remains: 11 veins remaining to be removed around 400 catseyes still need placing
update: 12th of april 2018 What remains: 9 veins remaining to be removed around 400 catseyes still need placing
update: 21th of april 2018 What remains: still 9 veins remaining to be removed (now less than 100k total ore (97k to be exact) remaining) around 400 catseyes still need placing
|
|
|
Post by vitez on Apr 30, 2018 20:15:46 GMT
Lost any form of sanity I had left... ... but this tunnel is now done Special thanks to those that helped me finish this tunnel. Cherikla Excel Override Aceynuu Badgirl Yserin and whoever I might be forgetting now cause my memory is hopeless and my notes are gone. Also thanks to those that cheered me on in GL-Freedom during the last final mining-spree...
|
|
|
Post by Gnawbone on May 2, 2018 8:22:47 GMT
It's an extraordinary tunnel. I noticed it the other day and entered. It went on and on and on...
Does it have a name? How about: Very Long Tunnel?
|
|
|
Post by vitez on May 2, 2018 17:31:35 GMT
It was the "The Hansa-Taco Manor-tunnel" However, since Taco Manor is gone, I'ld say The Hansa-tunnel could be a fitting name.
|
|
|
Post by Engineer on May 3, 2018 16:19:41 GMT
Well done!
paid
|
|