|
Post by jonhalo on Nov 28, 2017 23:53:39 GMT
Planned: imgur.com/DnLW9ZLUpdate 11/29/17: imgur.com/VH3OHsM (Finished the path on the east side to the Tunnel and started mining) REACHED X: 2862 Update 12/3/17: imgur.com/rfA9AEj (Went around the deed that is inactive, plan to dig through at a later date.) REACHED X: 2718 Update 12/9/17: No picture, currently are leveling out the tunnel due to downward slope over the first few hundred tiles. we expect to still finish in Q1 of 2018 however. Also was able to get the deed removed at the beginning of the tunnel so path was able to be continued through the deed. Update 12/15/17: No picture, leveled out the ground and are beginning mining again. if you come along and mine please level out tiles as you mine to prevent downward slope. Update 12/27/17: New picture imgur.com/JPSXhB6 . The hope is to finished at least digging through before the new year but it appears we have less than 200 tiles to go. Also we have yet to remove veins and reinforce but the floor has been leveled! Left side: X: 2216 Y:2218 X: 2216 Y:2219 Right side: X: 2931 Y:2218 X: 2931 Y:2219 715 Tiles long. I expect this to be finished in Q1 of 2018 If you own a deed between these point get in contact with me, also if you want to help get in contact.
|
|
bobk/Artem
Villager
It's the Constitution & Bill of Rights that are Important, NOT the Federal Government!!!
Posts: 35
|
Post by bobk/Artem on Nov 29, 2017 18:00:25 GMT
Hey, this Artem who owns Magnum Hold which is here andistyr.github.io/wu-map/14821/#magnum-hold It looks like you'll pass directly under my deed which I've expanded quite a bit and I got no Problem with your Tunnel Plans! When are you in-game mostly? So we can hash things out and I can be at the Deed Token to make adjustments that will be needed to make this happen for you! Artem PS. I have done some tunneling in that area so there might be some issues. If there are then I would think with Bridges you'd still be able to get thru just fine!
|
|
|
Post by jonhalo on Nov 29, 2017 18:22:33 GMT
Thank you for the reply. Towards friday this week I plan to go out and determine what is in the way and hopefully break ground on building the path to the tunnel and possible start the tunnel. I see that you are towards the end of the tunnel so I expect to be hitting that area toward January/ February.
|
|
|
Post by Chrisyou on Nov 29, 2017 23:08:58 GMT
I recommend coming in from both sides to even it out. I'm ready to mine
|
|
|
Post by jonhalo on Dec 1, 2017 18:43:52 GMT
Currently halted due inability to go through the Berserk's Steetlement owned by Berserks. If you see him online please direct him here or get him to set permissions for tunneling
|
|
|
Post by jonhalo on Dec 5, 2017 22:37:20 GMT
Progress made after routing around the deed until it can be removed in a week or 2 and a new update image has been added to the top post.
|
|
|
Post by jonhalo on Dec 9, 2017 23:32:56 GMT
new update
|
|
|
Post by jonhalo on Dec 15, 2017 21:52:16 GMT
update
|
|
|
Post by jonhalo on Dec 28, 2017 7:17:47 GMT
update before the new year
|
|
|
Post by vitez on Mar 4, 2018 13:36:00 GMT
It appears JonHalo has gone into hibernation. Tunnel-project continues by other members of the alliance Further updates in next thread: sklotopolis.freeforums.net/thread/3557/road-tunnel-hansa-taco-manorRemaining rock to be dug out (estimated 200 tiles long stretch) will be mined away to make tunnel 2 wide along the entire distance Remaining depostis and veins will be mined away to remove narrows Reinforcements will be put in place for a stretch of estimated 400-450 tiles to prevent cave-ins Catseyes will be placed to complete the tunnel for the highway network
|
|
|
Post by jonhalo on Mar 6, 2018 3:55:06 GMT
ty.
|
|
|
Post by jonhalo on Mar 9, 2018 3:46:31 GMT
Vitez project going forward, good luck
|
|
|
Post by Engineer on Mar 26, 2018 16:48:03 GMT
|
|