|
Post by yarpen on Feb 22, 2018 15:51:48 GMT
Road from the corner of the road at 2013, 1535 to the tunnel entrance at 2045, 1535 Tunnel exit at 2694, 1535 Road continues from Tunnel Exit planning to end around the road south of the Rift Zone at X2829 Eastern road may be altered due to deed crossing. Tunnel & Road have both been finished. The tunnel has been completely reinforced with the exception of veins. There are still veins within the tunnel, but I was told previously that this wasnt required for completion.
|
|
|
Post by yarpen on Sept 14, 2018 2:28:54 GMT
On the plus side: One lane of the tunnel is open from end to end. On the down side: My helper, Excel, has been MIA for a while, so it's only been me working on it lately.
|
|
|
Post by yarpen on Sept 25, 2018 22:39:49 GMT
Both Road Sections have been completed.
Eastern Roadway Starts at tunnel Exit 2695, 1535 and ends at 2827, 1541 next to Burning Inn. Western Roadway Starts at tunnel Exit 2044, 1535 and connects to road at 2013, 1535.
|
|
|
Post by yarpen on Dec 8, 2018 5:00:29 GMT
Bump to show completion
|
|
|
Post by Engineer on Dec 9, 2018 18:05:12 GMT
all paid. well done! thats an impressive tunnel
|
|