|
Post by inniria on Jan 8, 2020 13:11:42 GMT
Building a tunnel from the highway tunnel south of it, to my deed. Yellow section is the underground tunnel, going up 1940 dirts on a continuous 20-slope Lime section is a 2-tile flat highway segment (on surface) where the deeds waystone is placed Total length: 103 tiles (104 catseyes) I have already mined, reinforced and paved the tunnel. What is left is to mine an iron vein and place the catseyes.
|
|
|
Post by inniria on Jan 8, 2020 20:24:37 GMT
Vein mined and catseyes placed, tunnel is complete
|
|
|
Post by Engineer on Jan 15, 2020 20:06:01 GMT
paid
|
|