Post by vitez on Jan 18, 2023 23:21:34 GMT
First: Thanks Elfin, for telling me where to post this I'd like to ask permission for temporary roadworks. (This is not a new highway, so no payment... just permission requested.) In order to surface-mine the tiles alongside the highway, I need to remove the catseyes for a while and dig the road-edge down to the rock. After the surface-mining, the road will be restored and reconnected again. Estimated duration of project: 4-6 hours Stretch of highway goes from andistyr.github.io/wu-map/14821/#2986_1895 to andistyr.github.io/wu-map/14821/#2996_1858Greetings, Vitez
|
|
|
Post by Dominikk on Jan 21, 2023 20:10:13 GMT
Sorry for the late response. Permission granted.
|
|
|
Post by vitez on Jan 22, 2023 18:31:40 GMT
Update: project got halted halfway. I ran into a number of unexpected old abandoned mine-shafts. These block the surface-mining and need to be closed down before I can continue.
I reconnected the highway. Once the mineshafts are closed, I'll do the last few tiles.
|
|
|
Post by vitez on Feb 16, 2023 19:58:29 GMT
Second update: 5 mines blocking the project were closed. After that, the roadworks continued and are now finished. Road is reconnected.
|
|