zapp
Villager
Posts: 27
|
Post by zapp on Nov 29, 2017 7:23:00 GMT
This road and Bridge is now complete. The Bridge is actually 4 Slate Bridges covering 82 length. Starts at: X 2839 Y 3091 Finishes at: X 2791 Y 2926 Original Post below:
Planning new Bridge to link the western side of the SE island to the mainland. A lot of the road is already done on the Island side. Going to start work on the pillars. Highway starts at X2839, Y3091 (on my deed) and links to existing Highway. It goes West from their then turns North. Was planned originally to go Diagonally, but the remains of a house are in the way and degrading very very very slowly.
|
|
|
Post by contador on Nov 29, 2017 12:26:48 GMT
We can be paid for Bridges?
|
|
zapp
Villager
Posts: 27
|
Post by zapp on Dec 10, 2017 19:36:09 GMT
Ok this is finished as per the Rules. Means SE Island has a second means of escape Going to add the Catseyes, Waystones, Lamps, Statues, Pot Plants, etc over the coming week to it Ending the road on the North bank at - X 2791 Y 2926 Will leave it to the deeds over there to build up their road network, as its none existent.
|
|
|
Post by Engineer on Dec 17, 2017 17:52:36 GMT
paid
|
|