|
Post by Talohan on Dec 3, 2017 23:32:32 GMT
Canal build in progress Opening the waterway from the north side of x3479-y1605 to the Croc Bay at x3475-y1663. We was well along on this project before they new rule was added, in fact at point of building bridges and the final connecting tiles being removed and a bridge put in. The tile length is roughly 62-65 long and 2 wide bottom with paved slabs to be placed along the sides and lamps down center. There will be a bridge at both ends crossing it and also along the midway point will be a bridge. There will be a regulation highway on the West side connecting to another highway being built going West by Northwest. East side will be a single lane road for now running full length of canal from North to South with one end terminating at the highway already there going East to west. There is a secondary bridge being done that spans a private dock on a deed. People working on it so far; Talohan, Ullatec, Mctal, Soulslayer, Zuki, and Thrandisher.
|
|
|
Post by Engineer on Dec 6, 2017 19:08:22 GMT
looks good
|
|