|
Post by plasson on Nov 26, 2015 20:30:09 GMT
Central East coast Roadnetwork. - Highways, and some towers. -Plasson Multipart project, black lines are what I will focus on at first, Orange is for a later date, unless I get beaten to it and blue rectangles are towersites I will focus on when I get to them., more may pop up inbetween later, time permitting. Blue line at the bottom is primarily to show intended continuation of road, but it's construction is far down on the list. I will confer with Griffin's nest about connecting to them as I get near on the west end of road orignating from my Deed, Birchton by the clay deposit. Marked out in Black is 1500 tiles as a rough estimate, and will be conforming to highway standards, and also sanded along the side tiles when access to sand has become more convenient. As of writing I'm barely started with 50 tiles going east, and 1/3rd of a tower (Position of lines only intended as a rough in, eventual position may differ)
|
|
|
Post by plasson on Nov 28, 2015 1:50:06 GMT
Update:
Tower completed next to my settlement "Birchton" Rubbish ql, but should get around to improving that in time.
75x2 paved starting at the clay and going west
|
|
|
Post by Engineer on Nov 28, 2015 9:25:37 GMT
paid the tower and the tiles
|
|
|
Post by plasson on Nov 30, 2015 8:28:48 GMT
Another Tower up, plus 86 more tiles of smooth highway going further west from the last paid point. with the five tiles that got advanced on the first payment, lets call it an even 80
Tower is located 102 tiles from the first along the road.
going to work on the deed for a bit now, but will clean the area and denote the 2 last tiles at this count with log piles should I go on further before payment.
|
|
|
Post by Engineer on Dec 1, 2015 14:31:38 GMT
paid
|
|
|
Post by plasson on Dec 3, 2015 23:45:58 GMT
continuing on.
100 tiles westwards marked by a pile of small masts (generic item pile) right by the usual slabbed tower foundation. third tower placed 102 tiles past the previous, and markedand counted roadtiles are ~50 tiles beyond.
all 3 towers imped to ql40+
|
|
|
Post by Engineer on Dec 4, 2015 17:48:27 GMT
paid
|
|
|
Post by plasson on Dec 7, 2015 21:59:59 GMT
East-west road now complete with a final 160 tiles and 2 additional towers at regular spacing of 102 tiles and ql40+
Grand Total is ~420 tiles and 5 towers
I will now commence on the western North/south section originally planned for later. but giving this priority to link up with other Networks and settlements.
Sanding will be continued when I get the time to dig for more sand.
Should also complete the access road to the tar pit in the middle there, though I will only do that as a single track road. And Potentially place a tower there.
|
|
|
Post by Engineer on Dec 8, 2015 10:52:33 GMT
paid
|
|
|
Post by plasson on Dec 10, 2015 20:39:16 GMT
180 and change tiles done From western end of East/west road and down past Griffins nest. No Towers at this time.
|
|
|
Post by Engineer on Dec 11, 2015 18:52:53 GMT
paid
|
|
|
Post by plasson on Dec 18, 2015 15:56:56 GMT
100+ tiles done going south from the incomplete junction east of Griffins nest. Also 1 tower 60 tiles south, and another 102 tiles further south of junction/current paid sign. the road has not reached the last tower as of this typing, but just follow the line of trees should you do the inspect before I get around to continue it. Also made a tower, on sunday, which at the moment is a bit in "the middle of nowhere". It's located on the nort side of the sandbank on the SE coast. woubuc.github.io/wu-map/#3575_3102 this will be next to a road. as when I'm done connecting up with the road between devily and Noskulls places to the south, I will start making the eastern road from that tower, up towards Birchton. Refer to my original project map. would have waited until I had more road complete. but need to "clock" in those towers
|
|
|
Post by Engineer on Dec 19, 2015 10:24:13 GMT
paid all 3 towers and the road
|
|