|
Post by mcwidowmaker on Jul 1, 2017 12:50:07 GMT
|
|
|
Post by mcwidowmaker on Jul 3, 2017 6:18:56 GMT
Road built and tunnel started. 280 tiles of road.
|
|
|
Post by Engineer on Jul 16, 2017 14:03:32 GMT
road is paid, gl with the tunnel
|
|
|
Post by mcwidowmaker on Jul 25, 2017 18:56:29 GMT
Tunnel about half way, opened both sides and height levelled out. Now to connect the two ends. All systems go.
|
|
|
Post by mcwidowmaker on Sept 2, 2017 9:00:21 GMT
Tunnel completed, except for the last 4 tiles which I cannot reinforce as it is on another player's deed. \o/
|
|
|
Post by Engineer on Sept 2, 2017 16:17:27 GMT
paid, reinforced the last tiles
|
|