|
Post by reddagger on Oct 22, 2017 16:51:17 GMT
[blocked] completion is being blocked by a deed stake at (x3038, y2917) (Rome - by Basileus). It seems to have been abadoned for about two weeks, which is why I haven't reported it yet. Phase 1 of the project does not actually include the connection itself, which will require three 38-tile bridges, from (x3032, y2750) to (x3031, y2861). Segments: A- from (x3031, y2704) to (x3032, y2749), 92 tiles B- from (x3031, y2862) to (x3032, y2951), 180 tiles C- from (x3033, y2950) to (x3123, y2951), 182 tiles D- from (x3122, y2952) to (x3123, y3056), 210 tiles E- from (x3091, y3054) to (x3124, y3055), 64 tiles F- from (x3124, y3010) to (x3246, y3011), 246 tiles Total cobblestone tiles: 974 Most of it has gravel trimming, which is not being counted. The end of the last segment aligns with a highway being built by someone else.
|
|
|
Post by reddagger on Oct 23, 2017 1:23:33 GMT
All segments except B have now been completed. B have 13 tiles unable to be properly terraformed, all other tiles are completed aswell.
|
|
|
Post by Engineer on Oct 29, 2017 8:44:19 GMT
paid and fixed B
|
|