|
Post by Dweia on Nov 12, 2017 10:40:54 GMT
Our road from Swiftwood (south west bay) is continuing east and is now on the other side of the mountains connected to the 3 lane marble road going north/south. The road from the "paid until this point" sign (x1117 y 2948) to the marble road (x1330 y 2962) is now finished s18.postimg.org/lg9uizjuh/Roadmap.jpgGreetings from Dweia
|
|
|
Post by Engineer on Nov 12, 2017 13:57:36 GMT
paid
|
|