|
Post by Daerqueside on Sept 12, 2022 18:06:34 GMT
Location: andistyr.github.io/wu-map/14816/#2518_2280Start date: 13Sept2022 End date: 1 day, a maximum of two Highway at the above location will be severed for terraforming operations. Highway will be restored as soon as possible.
|
|
|
Post by Daerqueside on Sept 13, 2022 22:27:17 GMT
Project complete and highway is restored and operational.
|
|